Power planning
How to size a generator without guessing from the building size
Two buildings of the same size can need very different generators. One may have a few lights and office equipment; another may rely on pumps, lifts, compressors or production machinery. A sensible first step is to describe the loads and how they operate—not to estimate capacity from square footage.
1. Decide what backup means for your site
Separate essential loads from equipment that can wait. For a business, the list might include safety systems, communications, selected lighting, refrigeration or a particular process. For a home, it could mean a few circuits rather than the entire property. Be explicit about what must run simultaneously.
This conversation can reveal options besides buying a larger generator: load shedding, staged restart or backing up only critical circuits. Those choices need proper design, but they can make the system more practical.
2. Record running and starting demand
Gather equipment nameplates, measured demand or recent electrical data. Note voltage, phase, current or watts, and identify motors and other loads with inrush current. A motor’s starting method and whether several motors start together can change the required generator capacity.
Do not treat nameplate totals as a finished design. A qualified electrical professional should check diversity, power factor, starting voltage dip, load steps and the consequences of the largest equipment starting.
3. Compare kW and kVA on the same basis
kW refers to real power and kVA to apparent power. The relationship depends on power factor. Generator catalogues may show both values, but the rating basis—standby, prime or another duty—and site conditions also matter. Compare the manufacturer’s stated ratings with the type of load and operating pattern you actually have.
Ask the supplier to identify voltage, frequency, phase, power factor and any derating assumptions. Avoid converting figures with a guessed factor and presenting the result as a final specification.
4. Include the installation and the next few years
Capacity is only one part of the system. Consider ventilation, exhaust, fuel storage, sound, access for service, electrical protection and transfer equipment. If expansion is likely, include realistic future loads in the plan instead of applying an arbitrary oversized margin.
A useful enquiry includes a load schedule, the site location, expected hours, essential-load priorities, existing switchgear details and any space constraints. With that information, an engineer can evaluate options on a clearer footing.