Generator site readiness: a checklist before installation day

Installation day is easier when key decisions are made beforehand. A generator needs a suitable physical location, safe operating clearances, an electrical connection plan and a way for people and service equipment to reach it. The exact design must follow the equipment instructions and local requirements.

Confirm delivery and the physical location

Check the route from the delivery point to the final position, including turning space, lifting access, ground conditions and security. Confirm the equipment dimensions and weight with the actual unit data rather than a generic model photo.

Coordinate the base or foundation, drainage and any weather protection with the installation team. Leave room for doors to open and routine service tasks to be completed safely.

Coordinate heat, exhaust and fuel

Plan cooling airflow and exhaust discharge so the set can operate within the manufacturer’s limits and does not create an avoidable hazard for nearby occupants. Consider fuel storage, refuelling access, spill management and the expected operating duration.

Ventilation and exhaust should be reviewed by qualified professionals, with local rules and the specific equipment instructions in view. A canopy or enclosure also needs to be included in that review.

Settle electrical protection and transfer

Confirm the generator output, site distribution, earthing, protection, cable routes and transfer arrangement. If using an ATS, check its ratings and control interface against the generator and essential-load circuits.

Commissioning should verify the intended operating sequence and test relevant functions under controlled conditions. Make sure the responsible operator knows the normal checks, alarms and support contact before handover.